Jump to:
A |
E |
O |
P |
R |
WNumber of items: 6.
A
Abd Rahman, Norashidah
(2012)
Fatigue behaviour and reliability of Extended Hollobolt to concrete filled hollow section.
PhD thesis, University of Nottingham.
E
Elamin, Ahmed Mohamed Elamin Ahmed
(2014)
The face bending behaviour of blind-bolted connections to concrete-filled hollow sections.
PhD thesis, University of Nottingham.
O
Oti, Akponanabofa Henry
(2014)
Building information modelling for sustainability appraisal of conceptual design of steel-framed buildings.
PhD thesis, University of Nottingham.
P
Pitrakkos, Theodoros
(2012)
The tensile stiffness of a novel anchored blind-bolt component for moment-resisting connections to concrete-filled hollow sections.
PhD thesis, University of Nottingham.
R
Roshani, D.M.R.
(2005)
Integrated collaborative building design using Internet technology.
PhD thesis, University of Nottingham.
W
Wang, Zhiyu
(2012)
Hysteretic response of an innovative blind bolted endplate connection to concrete filled tubular columns.
PhD thesis, University of Nottingham.
This list was generated on Thu Dec 26 23:25:57 2024 UTC.