Investigating a Hybrid Metaheuristic For Job Shop Rescheduling

Abdullah, Salwani, Aickelin, Uwe, Burke, Edmund, Din, Aniza and Qu, Rong (2007) Investigating a Hybrid Metaheuristic For Job Shop Rescheduling. In: Proceedings of the 3rd Australian Conference on Artificial Life (ACAL.07), Gold Coast, Australia.

Full text not available from this repository.

Abstract

Previous research has shown that artificial immune systems can be used to produce robust schedules in a manufacturing environment. The main goal is to develop building blocks (antibodies) of partial schedules that can be used to construct backup solutions (antigens) when disturbances occur during production. The building blocks are created based upon underpinning ideas from artificial immune systems and evolved using a genetic algorithm (Phase I). Each partial schedule (antibody) is assigned a fitness value and the best partial schedules are selected to be converted into complete schedules (antigens). We further investigate whether simulated annealing and the great deluge algorithm can improve the results when hybridised with our artificial immune system (Phase II). We use ten fixed solutions as our target and measure how well we cover these specific scenarios.

Item Type: Conference or Workshop Item (Lecture)
RIS ID: https://nottingham-repository.worktribe.com/output/1017084
Schools/Departments: University of Nottingham, UK > Faculty of Science > School of Computer Science
Depositing User: Aickelin, Professor Uwe
Date Deposited: 12 Oct 2007 13:46
Last Modified: 04 May 2020 20:28
URI: https://eprints.nottingham.ac.uk/id/eprint/572

Actions (Archive Staff Only)

Edit View Edit View